Here's the Scope of Work/Material:
1. Ceiling Installation, cove lighting
2. Super White Tile installation in the living area and kitchen floor
3. Vinyl wood plank flooring in the second floor (Loft)
4. Stairs
5. Closet cabinet and drawers underneath the stairs.
6.. Electrical lighting and accent cove light
7. Kitchen sink, counter top, hanging and cabinet installation
8. T&B wall and floor tiles installation
9. Fixtures
10. Waterproofing
11. Steel bars and anchor bolt (Loft Frame and railing)
12. Overall painting